Library Service Infrastructure Review
A comprehensive review of all library branch infrastructures against all current library and building standards; Occupational Health & Safety standards etc – the project outcomes included a comprehensive infrastructure report and individual report by branch i.e.:
- Production of building condition reports for each branch with recommendations
- Production of branch building area data sheets based on current standards i.e. service based floor space calculations and associated requirements (these can be used by Architects as a design brief)
- Infrastructure Report incorporating the findings and recommendations of the building condition reports, service based requirements and recommendations
Clarence Valley Council has since recommended the building of a new central library (Grafton Branch)